Guide
Renovation Loans: Top-Ups and Construction Loans
A renovation loan in NSW is usually a top-up or a construction loan: Westpac's $250,000 line, as-if valuations, CDC or DA, and HBCF over $20,000.


On this page7
- Four ways to fund a renovation project
- As is or on completion: which value the lender uses
- Approvals in Ku-ring-gai and Hornsby
- Home building insurance and large job contracts
- A hypothetical renovation, worked through
- Over-capitalising, and the risk we’d worry about first
- What we look at first, and what we can’t do
A renovation loan is rarely a product of its own. For most owners in Australia it means borrowing more on the home loan they already have, or a construction loan that pays the builder in stages, with a line of credit and a personal loan as the less common options. Which one fits depends less on the rate than on the renovation project, because lenders sort renovations by size and by whether the work is structural. Westpac, for example, funds a renovation that costs $250k or less with a loan increase (checked 21 November 2026) and points bigger budgets to a construction loan.
Using home equity for renovations is the cheapest route for most people who have it. The catch is that equity is measured on the lender’s valuation of the property, not yours, and the two can be a long way apart.
This guide is for homeowners in NSW with a mortgage and a renovation project in mind, and it covers the four types of home renovation loans, which value the lender uses, the approvals and insurance that come with the work, and a worked hypothetical.
Four ways to fund a renovation project
Each has a place. The trade-offs come down to how the money is released and what it costs over the loan term. Size and structure matter most.
Topping up the home loan you already have
A top-up, or equity release, increases your existing mortgage and pays the extra out as a lump sum. Westpac says the maximum, including the existing loan, is up to 90 per cent of your property value, with lenders mortgage insurance likely once the LVR goes past 80%. ANZ offers a supplementary loan as a separate split against the same equity. CommBank points to the lower interest rate compared with some other loan types, such as a personal loan, because the money is priced as a standard home loan. Westpac also says top-ups only work with variable rate loans and renovations that don’t involve construction, so a fixed rate loan usually means a separate split instead.
The trade-off is interest. The whole loan amount is drawn on day one, so you pay more interest on money the builder may not need for months, and a kitchen spread across a three-decade loan costs far more than its sticker price unless you pay it down faster. Our renovation calculator shows the extra repayment and how much equity you have to work with, and the usable equity calculator tests what a lower valuation does to it.
A construction loan for structural work
A major renovation with structural changes is a different product. ANZ says work that typically needs council approval or a building permit should go on a construction loan instead, and Westpac says a renovation budget over $250,000 could go on one. The lender pays the builder in progress payments as each stage is completed, and you’re only paying interest on what’s been drawn. Westpac asks for a fixed price building contract with a progress draw schedule and, usually, council approvals before it starts.
Construction finance comes with heavier paperwork and a longer application process. CommBank doesn’t offer construction loans on an owner builder basis, so a renovation project you plan to manage yourself usually needs another route. Our construction loan calculator shows the interest stage by stage, and the knock down rebuild guide covers the same loan type when the house comes down entirely.
A line of credit
A line of credit is a limit secured on the home that you draw and repay as you like. Moneysmart describes it as one account where interest is added to the loan each month and repayments aren’t needed while you stay within the limit. That flexibility is the problem. With nothing due, a renovation drawn on a line of credit can sit there for years, growing, which is why we rarely suggest one for building work.
Personal loans and green loans
Personal loans suit small home improvements and borrowers without much home equity. Most are unsecured personal loans with no collateral, and Moneysmart says unsecured loans usually have higher interest rates, though it also notes shorter terms can mean less interest overall. ANZ puts it plainly: the rate is often higher for a personal loan than for home loan options. CommBank lends from $4,000 up to $50,000 on its personal loans. Some banks discount personal loans for energy upgrades, the products sold as green loans, and CommBank’s covers solar panels, batteries and heat pump hot water, from $4,000 to $50,000 over one to seven years (terms current as at 3 November 2026).
As is or on completion: which value the lender uses
The valuation sets the ceiling on everything above. For a top-up, ANZ says a valuation is done before any renovation begins, so you’re borrowing against the existing property as it stands. A construction loan can work differently. CommBank’s construction guide describes an “as if” valuation, which sets what the property will be worth at the completion of construction and is usually done before final approval.
That’s what makes finance for larger jobs possible for owners whose equity today wouldn’t stretch. But a valuer doesn’t add the builder’s invoice to the price, and the difference between what an extension costs and what it adds on paper can be large. CommBank also says items outside the building contract, such as appliances or a pool, need formal quotes or receipts or the valuation is done without them.
Approvals in Ku-ring-gai and Hornsby
For a home renovation, approval decides the loan type as much as the budget does. Minor work like a deck, a fence or painting the house can be exempt development needing no planning approval, though it still has to comply with the National Construction Code. Ku-ring-gai Council says kitchen renovations may not require development consent and lists alterations and additions to a house as possible complying development. The NSW Planning Portal says some internal alterations, such as new openings, doors and changes to the internal floor layout, can be complying development, with limits on external work in heritage conservation areas.
A complying development certificate is the fast track, and Hornsby Shire Council says one can be obtained within 20 days or less through council or an accredited certifier. Work that doesn’t qualify goes to a development application, which the state planning department puts at an average determination time of 70 days.
That timing feeds straight into the renovation loan. A construction loan waits on approved plans, so an approval that drags on holds the loan up with it. We’d settle the pathway before anything else.
Home building insurance and large job contracts
NSW home building law changes once the job passes $20,000. icare says home building compensation cover is required by law for most residential building work valued at more than $20,000, and the builder must give you a certificate of insurance before work starts and before you pay anything, including a deposit. It covers incomplete or defective work if the builder becomes insolvent, dies or disappears. The NSW Government’s contracts page says a job over $20,000 needs a large job contract with a cooling-off period of five clear business days, and the maximum deposit is 10 percent. No certificate, no deposit.
A hypothetical renovation, worked through
Here’s a hypothetical with invented numbers. An owner in Wahroonga has a house the lender values at $2,000,000 and owes $1,100,000, so usable equity at 80% is $500,000. Plans for a new kitchen and two bathrooms, nothing structural, come in at $180,000, and with a 15% contingency the total is $207,000.
That fits as a renovation loan on a top-up, and the loan moves to $1,307,000, an LVR of about 65%. Now swap the job for a second storey at $650,000, which with the same contingency is $747,500, well past both the equity and Westpac’s top-up line, so it becomes a construction loan.
The construction loan is where the valuation basis matters. If the lender’s as-if valuation of the finished house came in at $2,600,000, 80% of that is $2,080,000, leaving $980,000 of room above the existing loan. If it came in at $2,200,000, the room shrinks to $660,000 and the job no longer fits with its contingency. Same house, same builder, different valuer.
Over-capitalising, and the risk we’d worry about first
Over-capitalising means spending more on a home renovation than it adds to the property’s value, and CommBank’s construction guide warns against letting a renovation outweigh the value of your home if you sell later. On the upper North Shore it’s harder to do than people fear, because so much of a house’s price is the land under it. A new kitchen in Turramurra is a small share of what the property is worth.
Our opinion, which plenty of renovators and some valuers will disagree with: for owners who plan to stay, over-capitalising is the smaller risk. The one we’d worry about first is under-borrowing. A renovation loan sized exactly to the quoted renovation costs leaves nothing for the variation the builder finds behind a wall, and that gap usually lands on a credit card or a personal loan at a much higher rate than the home loan, or eats into savings meant for something else. NAB suggests a 10 to 20% buffer in the budget for that reason (checked 21 November 2026).
What we look at first, and what we can’t do
Charlie Lo Surdo, the mortgage broker who wrote this guide, starts most renovation loan conversations with the builder’s quote and the approval pathway rather than the rate, because those two decide which loan type is even on the table. From there it’s a question of which lenders treat your renovation project as a top-up and which want a construction loan, because different lenders draw that line in different places, and sometimes a refinance to a new lender that handles both is cleaner than splitting the work across two banks.
What we can’t do, as a mortgage broker, is price the work. We don’t know what your bathroom will cost, and we won’t guess; a licensed builder’s quote is the only number worth borrowing against. We also can’t make a valuer agree with your agent, or make most lenders overlook an income that won’t carry the bigger loan. If you’re deciding between renovating and moving, the upgrading page covers buying before you sell, and our guide to using equity to buy an investment property runs the same equity maths for a second purchase.
Sources
- westpac.com.au a renovation that costs $250k or less
- anz.com.au supplementary loan
- commbank.com.au lower interest rate compared with some other loan types
- commbank.com.au on an owner builder basis
- moneysmart.gov.au interest is added to the loan each month
- moneysmart.gov.au usually have higher interest rates
- anz.com.au often higher for a personal loan than for home loan options
- commbank.com.au from $4,000 to $50,000 over one to seven years
- planning.nsw.gov.au exempt development
- krg.nsw.gov.au kitchen renovations may not require development consent
- planningportal.nsw.gov.au new openings, doors and changes to the internal floor layout
- hornsby.nsw.gov.au can be obtained within 20 days or less
- planning.nsw.gov.au average determination time of 70 days
- icare.nsw.gov.au required by law for most residential building work valued at more than $20,000
- nsw.gov.au large job contract
- nab.com.au a 10 to 20% buffer
Talk to a broker in under a minute
Three quick taps, then your details, and a real broker replies within one business day.
★★★★★ 5.0 · 200+ Google reviews