How to Refinance a Construction Loan

Most lenders won't take over a part-drawn construction loan. Refinancing after completion: the occupation certificate, final valuation and P&I switch.

Portrait of Charlie Lo Surdo, Finance Broker

By , Finance Broker

Reviewed by Ansa Ansari,

Published · 8 min read

A large two-storey rendered house in Pymble with a double garage, set on a sloping lawn
Pymble. Photo: Sardaka, CC BY-SA 4.0, via Wikimedia Commons
On this page7
  1. Can you refinance a house that is under construction?
  2. How construction loans work, and why half a house won’t do
  3. Builder progress claims and the NSW contract rules
  4. What changes when the house is finished
  5. Home loan options after completion: valuation, lenders mortgage insurance and costs
  6. A hypothetical, run through the numbers
  7. When to move your existing home loan, and what we’d do

You can refinance a construction loan, but almost always only once the house is finished. Mid-build switches are rare. While the build is underway, the property is half a house with a builder’s contract attached, and most lenders won’t accept it as security for a new home loan. So the usual path is construction loan then refinance: build with one lender, collect the occupation certificate, let the loan convert, and then compare it against the market like any other home loan.

The hard part is the gap between those two points. This guide is for owners part-way through a build, or close to finishing one, who want to know when they can refinance construction loan debt and what it will cost.

Can you refinance a house that is under construction?

Rarely. Macquarie’s broker credit guidelines, last updated 19 November 2026, say partially complete properties, including properties where construction has commenced in any form, are unacceptable for its standard loans. It will only look at one under its construction loan rules, and only where the same builder who started the house is finishing it. CommBank won’t even let you change products on its own construction loan mid-build: its guide says switching to another type, such as a fixed rate, isn’t available while it’s being progressively drawn.

That’s what we could confirm in writing, checked 21 November 2026. We couldn’t find any lender that publishes a policy for taking over another bank’s part-drawn construction loan, and the construction pages of Westpac, NAB and Bankwest don’t address it either way. Lenders mostly set this out in credit manuals written for brokers, so treat “most lenders won’t” as the general position rather than a rule every lender has published. Ask before you assume.

The one switch that is routine happens before the first progress payment. If your land loan sits with a different bank, ANZ says it will need to refinance to ANZ before it funds the build. That’s the cleanest point to choose your lender, because after the first drawdown the choice is mostly made.

How construction loans work, and why half a house won’t do

A construction loan is lent against a house that doesn’t exist yet. How much you can borrow depends on that future value: Macquarie bases its construction LVR, capped at 80%, on the lower of the on completion valuation or cost to complete, which is the contract price plus the land. That works when one lender controls every progress payment from slab to keys. A lender arriving at frame stage inherits payments it didn’t approve, a builder it didn’t vet, and a valuation it can’t rely on.

Owner builders have it harder again: the same Macquarie guidelines list owner/builder construction as unacceptable security outright, though not every lender goes that far.

Major renovations get caught by the same rule: if the lender is relying on the value of the house once the work is done, Macquarie says the renovation loan must be assessed as a construction loan, with funds released to the builder against invoices. So a refinance to cover renovation costs halfway through the job runs into exactly the same wall as a new build, while a refinance before work starts, borrowing against the house as it stands today, is an ordinary equity release.

Builder progress claims and the NSW contract rules

The progress payment schedule in the building contract is what the lender pays against, so it’s worth reading before you sign. In NSW, any contract over $20,000 must have a progress payment schedule, and NSW Fair Trading says the payments must match the work carried out, either fixed amounts after specified stages are finished or, for cost plus work, claims backed by invoices and receipts. The same page tells owners to check with the lending bank about any special requirements for progress payments.

Here’s the catch. The Housing Industry Association notes that many lenders want the schedule in line with an industry standard, and then points out that this does not exist in NSW. So a builder’s schedule that front-loads money can be perfectly legal and still clash with what the lender is prepared to release at each stage. Bankwest, for one, sends a valuer at the slab or base stage and again before the final progress payment, and if a claim runs ahead of the work, the valuer will see it. If you need additional money to finish, the lender pays only what’s scheduled, and an overrun parked on a personal loan becomes one more debt the next lender counts against you.

Our knock down rebuild guide covers the builder’s deposit limit and the home building compensation cover. This part matters for refinancing because a dispute over a progress claim is one of the ways a build stalls, and a stalled build is exactly the property no new lender wants.

What changes when the house is finished

Completion is where the paperwork bunches up. The certifier and the lender both want to inspect the finished house, and then the loan converts. Plan for it.

In NSW, the occupation certificate authorises the occupation and use of a new building, and you must be issued one before you move in. The lender wants proof the house is finished too: Bankwest does a final valuation to make sure it’s been built as per the original plans and may ask for the occupation certificate, and ANZ needs the building insurance certificate, plus a certificate of occupancy if your state requires one, before it makes the final payment.

Then the repayments change, which is the part that catches people, because for many borrowers the whole loan balance starts paying principal. During the build you pay interest only on what’s been drawn, so the interest costs start small; our construction loan calculator shows how that grows stage by stage. After the final payment, Bankwest moves borrowers who chose interest only until fully drawn straight onto principal and interest, while those who chose an interest only term continue to pay interest only for three or five years. CommBank’s guide says the same thing in different words, switching repayments to whatever was chosen at the start.

Loan structure and features change too: if you kept the existing home loan on the land separate, CommBank’s guide says the two loans can be combined after completion, but that this may require a new refinance application, so the refinance process may start whether you move lenders or not. NAB’s terms say you won’t be able to access redraw while your home loan is a building loan, and an offset account is worth checking for on the new loan product, since the balance it offsets is at its largest once the whole loan amount is drawn.

Home loan options after completion: valuation, lenders mortgage insurance and costs

Once the loan has converted, it’s an ordinary home loan and you can refinance your existing loan like any other, to a better variable rate, a fixed period, or a loan structure with an offset account. The new lender reassesses your income and financial situation as it would for any new home loan, and orders its own valuation of the finished property. And that number can be lower than the as-if-complete figure your construction lender approved before the slab went down.

If it is, your loan balance doesn’t move but your LVR does. Above 80%, Moneysmart warns you might have to pay lenders mortgage insurance on the new loan. Your current lender already approved the loan on its valuation, so staying put doesn’t trigger that cost. If the valuation comes in above the loan instead, that equity is what a refinance can release, often for the landscaping or driveway the building contract left out.

The rest of the cost of switching is the same as any refinance: a discharge fee to the old lender, NSW registration fees, possibly application and valuation fees at the new one, and a break cost if you’ve fixed. Our guide to the cost to refinance goes through each, and the refinance calculator works out how many months a lower interest rate takes to pay them back. Compare loans on the comparison rate rather than the headline rate, since it folds the ongoing fees in, and keep the loan term the same, because stretching it back to a fresh full term makes the monthly payments look smaller while you pay more interest overall.

There’s a cost on our side you should know about. If a lender pays a broker an upfront commission and the loan is refinanced or paid out early, it claws some or all of it back. ASIC’s 2017 review found most lenders set that clawback period at commonly two years. That gives any broker who wrote your construction loan a reason to discourage an early switch. Ask us directly.

A hypothetical, run through the numbers

Here’s a hypothetical with invented round numbers. An owner has $700,000 of existing debt on the land, signs a $900,000 building contract, and the construction lender’s as-if-complete valuation is $2,100,000. At completion the loan is $1,600,000, an LVR of 76.2%, and it’s been interest only at a hypothetical 6.5%, about $8,667 a month.

Then it converts, and principal and interest over 30 years at the same 6.5% is about $10,113 a month, roughly $1,446 more, starting the month after the final payment. A refinance to a hypothetical 6.1% would bring that down to about $9,696, saving around $417 a month.

But if the new lender values the finished house at $1,950,000, the LVR becomes 82.1%. To stay at 80% the owner would need to put in about $40,000, close to eight years of that saving, or pay LMI on the new loan. That’s why the property value decides the switch, not the interest rate.

When to move your existing home loan, and what we’d do

Timing is mostly decided before the slab is poured: CommBank says building must start within 12 months of the disclosure date and finish within 24 months of the first progress payment, or the undrawn part of the approval may be withdrawn, and ANZ gives 24 months from the first drawdown. A build that overruns those windows is a conversation with your current lender, not a refinance.

Our view, which plenty of brokers won’t share: choose the construction lender as if you’ll keep the loan for five years, not for the build. A sharp construction interest rate from a lender whose ordinary home loans are uncompetitive sets you up for a refinance at the worst moment, straight after completion, with a fresh valuation on a house the market hasn’t tested and the repayment jumping at the same time. We’d rather pay slightly more during the build and not need to move at all. Moving is the expensive part.

Charlie runs our construction refinances and starts by asking for three documents: the progress payment schedule, the letter of offer and the most recent valuation. What we can’t do is move a part-drawn construction loan to a new mainstream lender because a builder has fallen behind, and if the builder has gone broke, that’s an insurance claim before it’s a finance question. Once the occupation certificate is in, our refinancing page is where that conversation starts. If you’re weighing a private loan behind the bank to get a stalled build finished, read our second mortgage guide first. This guide is general information, not advice on your circumstances.

Sources

  1. macquarie.com.au including properties where construction has commenced in any form
  2. commbank.com.au isn't available while it's being progressively drawn
  3. nab.com.au NAB
  4. anz.com.au need to refinance to ANZ
  5. nsw.gov.au must have a progress payment schedule
  6. hia.com.au this does not exist in NSW
  7. planningportal.nsw.gov.au authorises the occupation and use of a new building
  8. bankwest.com.au final valuation to make sure it's been built as per the original plans
  9. nab.com.au won't be able to access redraw
  10. moneysmart.gov.au might have to pay lenders mortgage insurance
  11. download.asic.gov.au commonly two years
  12. anz.com.au 24 months from the first drawdown

Talk to a broker in under a minute

Three quick taps, then your details, and a real broker replies within one business day.

★★★★★ 5.0 · 200+ Google reviews

5.0 from 200+ Google reviewsRead every one of them on our profile
6 industry award wins & nominationsRecognised across the broking industry
Family-run, four brokersOne office, at 4 Kamilaroy Rd
No cost to youLender-paid, disclosed in writing. ACL 509484

Talk to a broker in under a minute

A real broker replies within one business day — usually much faster

Step 1 of 3 — no typing needed

Is this your first home loan?

Prefer to talk? Call (02) 7229 7363

★★★★★ 5.0 · 200+ Google reviewsCredit representatives of Buyers Choice Licencing Pty Ltd · ACL 509484